The purpose ofthis study was to identify deficiencies in the operation ofenergy systems within the commissary. The overall goal of this work was to investigate methods for more efficient design and operation of DeCA facilities . TM 5-697 (2) Diagnostic testing ofenergy systems at the Fort Myer commissary was conducted from September 1996 through July 1997 . Activities included meeting with the maintenance contractor, reviewing system design, assessing equipment condition, walking through the facility, reviewing the metering plan, collecting data using dataloggers, review and repair of equipment, performance verification testing (PVT), single-point measurement testing, installation of a kWh pulse meter, repair of a facility power meter, and checkup visits for operational review ofthe refrigerant management and control system (RMCS).
DesignationTM5-697 comm mech
EditionDec 2002
StatusSuperseded
Pages113
FunctionEngineering
CollectionRecent Archive