I. Scope a. The scope of this series of manuals, as listed in b below, is to cover the latest informa tion and instructions for judging cannon tubes for the guidance of ordnance personnel con cerned with cannon tube inspection and calibra tion. The subjects covered are: Evaluation of cannon tubes; the operation and maintenance of bore inspection devices; and operation and maintenance of velocity measuring equipment. b. This manual is one of the series relating to cannon tube inspection. The complete series is listed in (1) through (3) below. (1) TM 9-1000-202-35 Operating Procedures: Evaluation of Canon Tubes. (2) TM 9-4933-200-35 Operation and Field and Depot Maintenance: Pullover Gages, Borescopes Ml and M2, and Pressure Gage M3. (3) TM 9-1860-7 Operation and Organizational Maintenance: Field Sky Screen and Counter Chronograph. c.
DesignationTM 9-1000-202-35
EditionMay 1959
StatusSuperseded
Pages87
FunctionSustainment
CollectionHistoric
Public domain (U.S. Government work)