ADDENDA V INSTALLATION V-1. CABLING. cause of their exposed location. a. At the beginning of paragraph 2-20, b. Add the following at the end of para- CABLING, insert the following: graph 2-20a: After all cables passing through © CAUTION: To avoid damage to the trailer hatch have been installed, tie the cables, do not bend them into an are canvas blackout cover around them. Leave with less than a 6-inch radius. enough slack in the console cables to allow Cables connecting to the modulator pulling the console away from the wall of the are particularly liable to damage be- trailer. ADDENDA VI TEST EQUIPMENT VI-1. CRYSTAL RECTIFIER TEST SET TS-268/U. Delete Crystal Rectifier Test Set TS-268/U from figure 1-31, and substitute figure 1-31.1. TL 48269 Figure 1-31.1. Crystal Rectifier Test Set TS-268/U.
DesignationTM 11-1366
EditionMay 1945
StatusSuperseded
Pages150
FunctionComms Signal
CollectionHistoric
Public domain (U.S. Government work)