The first step in designing a railroad is to determine the type and volume of traffic to be handled. Traffic type and volume will generally govern the size and arrangement of terminal facilities, the number of auxiliary tracks required, and track structure design. b. The traffic handling capability at an installation must cover existing and foreseeable requirements, that usually include: (1) Mobilization outloading. (2) Training exercises. (3) Installation supply (routine traffic). c. Once assembled, data on traffic volume and type should be reviewed and approved before proceeding with the design process. 2. TRAFFIC TYPE. Information gathered on traffic type should include: a. Type of cargo to be handled. b. Type and size of freight cars to be used. c. Manner in which cargo will be loaded and unloaded. d.
DesignationTI 850-02
EditionMar 2000
StatusSuperseded
Pages175
FunctionEngineering
CollectionRecent Archive
Approved for public release; distribution is unlimited.