TM 3-1040-204-14 MU393401 Figure 1-1. M2A1-7 portable flamethrower. pressure tank is strapped to the fuel tanks (1, fig. 1-5). A hinged tank clamp (2) holds the pressure tank in place. The valve shaft (5) is clamped to the body of the fuel…Historic94 pagesCBRN
This publication provides technical information about training and combat techniques for the M320 grenade launcher. Intended users include leaders and designated grenadiers who will use this information to successfully integrate the M320…Archive168 pagesMarksmanship Weapons
This technical manual (TM) provides technical information and training and combat techniques for shoulderlaunched munitions. Intended users include leaders and designated Soldiers who will use this information to successfully integrate…Archive224 pagesMarksmanship Weapons
The medium girder bridge (MGB) is lightweight, hand-built, bridging equipment. It can be built in various configurations to provide a full range of bridging capability for use both in the forward battle area and in the communications zone.…Archive104 pagesEngineering
This manual provides essential technical information on nonstandard fixed bridges for engineer staff officers. It is the doctrinal source of information for the United States (US) Army on the North Atlantic Treaty Organization (NATO)…Archive530 pagesEngineering
The engineer F&ES mission is preventing fires and minimizing losses of lives and property, alleviating the negative impact to the environment support humanitarian needs. Included both man-made and natural incidents; fire prevention and…Current90 pagesEngineering
PUBLICATION NOTICE ROUTING 1. NTRP 4-04.2.5/TM 3-34.42/AFPAM 32-1020/MCRP 3-17.7F (DEC 2012), CONSTRUCTION PROJECT MANAGEMENT, is available in the Navy Warfare Library. It is effective upon receipt. 2. This publication is a multiservice…Archive288 pagesEngineering
This publication has been prepared under our direction for use by our respective commands and other commands as appropriate. ANTHONY C. FUNKHOUSER K. J. GLUECK, JR. Brigadier General, USACurrent342 pagesEngineering
Planning, design, and construction of electrical power systems for theater-of-operations facilities: power generation, distribution, interior wiring, and electrical safety. Supersedes FM 5-424.Current268 pagesEngineering
29 July 2022 TM 3-34.47/MCRP 3-40D.3 1-1 Chapter 1 Construction Drawings Before the carpenter can begin his work, he must have a complete set of construction drawings or prints. He must be familiar with how the drawings are prepared. He…Current282 pagesEngineering
The United States Army Engineer School developed this publication with the joint participation of the approving Service commands. The test procedures and terminology used in this manual conform to the latest methods and specifications of…Current402 pagesEngineering
The United States. Army Engineer School developed this publication with the joint participation of the approving Service commands. The design of new structures and facilities is based on the results obtained from the methods and procedures…Current416 pagesEngineering
This special conversion does not integrate any changes in Army doctrine since December 1972 and does not alter the publication's original references; therefore, some sources cited in this TM may no longer be current. For the status of…Archive448 pagesEngineering